Type of Projects:
Offshore O&G installations
Stage: FEED Engineering
Mobilization: Septembre 2024
Duration: 6 to 8 months
Scope:
will work under the supervision of the project manager
will be the leader of the discipline for the project
will prepare all documentation related with the project scope (refer to typical deliverable list)
must be autonomous as no additional manpower in the project team
Will be charge of:
Project planning and progress follow-up
Organisation of the meetings with client and internal
Interactions with client and the project management
Technical documentation production
Coordination with other disciplines
Typical deliverable list:
· Safety Concept
Philosophies :
· Active and Passive Fire Protection
· Fire and gas detection
· Escape
Specifications :
· Passive Fire Protection
· Fire & Gas Detectors
· Safety Equipment (Firefighting & Lifesaving)
· Flooding system
Calculation Notes:
· Safety Distances
· Flammable and Toxic Gas Dispersion
· Fire Water Demand
· Foam Demand
· Fire & Explosion Risk Analysis
Layouts :
· Hazardous Area layouts
· Escape routes
· Safety Equipment layouts
· Fire Zone / F&G Detector arrangement layouts
Lists:
· Safety Equipment List
· Hazardous Area Classification Schedule
· Effluent List (Environment)
Process:
· UFD – Firewater System
· P&IDs for Firewater Network
· Fire & Gas Logic Diagrams
· Scope of Work for Safety studies:
· Fire & Explosion Risk Analysis (FERA)
· Noise Study
· RAM Study
Reviews (Preparation, Participation and Reports):
· HAZID
· HAZOP for Fire water pumps
Experience as a Senior/Lead in O&G Offshore projects: 10 years minimum
Language: Fluent English – Good written and verbal communication
Knowledge:
Standards: Applicable regulations, codes of practice, international standards including 4th revision of EI15, NFPA 10 to 16, NFPA 2001, IEC 60079
TOTAL GS if possible
Software: PHAST (and Pipenet if possible)
3D Model: Familiar with 3D model viewer software Autodesk – Naviswork
ALIASOL – Copyright 2024 – Réalisé par DQ Web & Design