Type of Projects:
Offshore O&G installations
Stage: FEED Engineering
Mobilization: Septembre 2024
Duration: 6 to 8 months
Scope:
will work under the supervision of the project manager
will be the leader of the discipline for the project
will prepare all documentation related with the project scope (refer to typical deliverable list)
will organize and supervise the work of other engineers
Will be in charge of:
Project planning and progress follow-up
Organisation of the meetings with client and internal
Interactions with client and the project management
Coordination with other disciplines
Typical deliverable list
· Electrical design basis
· Philosophies (Black start, Control, Earthing, etc…)
· Specifications, Data Sheets and Requisitions for:
o Generators
o Transformers
o HV & LV Switchgears
o HV & LV Motors
o Variable Speed Drives
o Transformers
o AC & DC UPSs
o HV & LV Power and Control Cables (AC/DC)
o Electrical Control System
· Consumer list and Power balance
· Equipment sizing calculation notes (Generators, Transformers, UPSs & Cables)
· Electrical power system studies calculation notes (Load Flow, Short circuit & Motor starting) with ETAP Software
· Single Line Diagrams (Overall, HV&LV Typicals, Protection diagrams,etc…)
· Cable routing & Earthing layouts
· Electrical technical buildings or Substations design
· Cable list
· Electrical Control System I/O list
Experience as a Senior/Lead in O&G Offshore projects: 10 years minimum
Language: Fluent English – Good written and verbal communication
Knowledge:
Standards: Applicable regulations, codes of practice, international standards (IECs, NFC15-100, NFC13-200), ATEX & IECEx
TOTAL GS
Software: ETAP Power System Analysis if possible
ALIASOL – Copyright 2024 – Réalisé par DQ Web & Design